An EIFS siding, concrete footings poured in place, metal roofing, nine
foot interior ceilings, concrete decks, steps and ramp, split system zoned
central HVAC, gutters and downspouts,
painted interior walls, four classrooms and two restrooms are features of this
private school building installed in Flower Mound, Texas for Christ Presbyterian
Church. The project was completed on a turnkey basis by Nortex and was designed
to match the finishes of the existing church building in almost all respects.